Lianhong Gerun Integrated Project of New Energy Materials and Biodegradable Materials

In December 2025, the main units of the integrated project for new energy materi

In December 2025, the main units of the integrated project for new energy materials and biodegradable materials at Lianhong Gerun were successfully commissioned and put into operation at one go, producing qualified products smoothly. The torch facilities that our company participated in the construction of were successfully ignited and put into use in November.

The Lianhong Gerun integrated project boasts a total investment of 12.5 billion yuan, with its MTO, PO, and PPC units demonstrating domestic leadership in terms of production capacity and technological progressiveness. Our company has designed and undertaken the construction of the elevated flare unit, which utilizes the most advanced steam-assisted flare tip. This ensures the most efficient use of smoke-eliminating steam, effectively reduces smokeless combustion during flare gas emissions during startup and shutdown phases, and achieves dual guarantees of environmental compliance and safety.

The core equipment of the torch head provided this time has been highly recognized by the owner:

1. Low operating costs: By adopting efficient combustion and multi-channel steam combustion-supporting technologies, the gas consumption of pilot burners and steam consumption are reduced by 30% compared to the industry average, significantly reducing operating energy consumption and one-time construction investment in steam pipe networks, achieving remarkable low-carbon, energy-saving, and economic benefits.

2. Equipment stability: The flare has a wide operating range and high flexibility. It has strong adaptability, stable emission and combustion, ensuring flame stability and burnout rate, without backfire or smoldering. It has a large adjustment ratio and good operational flexibility. The pilot burner has excellent weather resistance, with a 100% ignition success rate and high automation, reducing the frequency of on-site inspection and operation by personnel.

Our company's project construction team provides professional services throughout the construction, training, and commissioning stages, and ensures on-site support during the start-up phase. Xianghongsheng Technology will continue to forge ahead with the philosophy of making every project a quality one, in order to repay our customers for their choice and trust.


  图片1.png


 图片2.png